Karowe spent $13.6 million on the UGP in Q2 2025

Aug 28, 2025

KaroweThe Underground Project [UGP] is designed to access the highest value portion of the Karowe orebody, with initial underground carat production predominantly from the EM/PK(S) unit. The Company is currently reviewing its Under Ground Project mining ore extraction methodology, project costs and schedule.

The UGP has progressed very well including reaching the bottom of the production shaft in late July 2025 and achieving 2,000 lost-time injury free days. The ore extraction review has focused on further understanding the orebody geomechanics and modelling possible caving scenarios to safely recover ore from the UGP.

This review has included producing a new geomechanics numerical model along with performing caving simulations, which affect ore extraction levels and extraction point designs. The Company has initiated detail engineering of the lateral development portion of the UGP and is currently completing a revised life of mine plan based on the results of the simulation work.

The mine extraction review does not impact the current UGP development. The Company continues to advance as planned to the lateral development phase of the project. UGP development work continues with equipping the production shaft, commissioning of the shaft conveyances and progressing with its underground infrastructure development near the shafts. Additional lateral development towards the kimberlite is also planned for H2 2025.

During Q2 2025, the UGP achieved a twelve-month rolling Total Recordable Injury Frequency Rate of 0.49. The UGP to date Total Recordable Injury Frequency Rate up to June 30, 2025 was 0.55.

A total of $13.6 million was spent on the UGP in Q2 2025 primarily for activities related to the skip loading pocket at the 285-level2, station development on the 335-level and 310-level, additional lateral developments and surface infrastructure.

You May Also Like

Facebook Feeds

Cover for Heera Zhaveraat
94,166
Heera Zhaveraat

Heera Zhaveraat

Offical Facebook account of heerazhaveraat.com, homepage for Trade News, Articles and Promotion of D

This message is only visible to admins.
Problem displaying Facebook posts.
Click to show error
Error: No posts available for this Facebook ID

Twitter Feeds

✨ Watch jewellery come to life at DJGF 2026!Experience the Live Art Space, where skilled artisans bring Thewa Art and Silver Jewellery to life before your eyes.📍 Bharat Mandapam, New Delhi
📅 26–28 Sept 2026DJGF 2026 — An Experience Beyond Exhibition.

💎 SAVE ₹2,500 ON YOUR VISIT!Be part of Jewellery & Gem DELHI – Apna Delhi Wala Show, North India’s No. 1 B2B Jewellery Show.✨ 750+ Exhibitors | 3,000+ Brands
📅 26–28 Sept 2026
📍 Bharat Mandapam, New DelhiRegister online & save ₹2,500!

DJGF 2026 IS SOLD OUT!

Exhibitor space for the 14th edition is officially fully booked. Thank you to our exhibitors, partners & the jewellery fraternity for the incredible support!

📅 26–28 Sept 2026
📍 Bharat Mandapam, New Delhi
#DJGF2026 #SoldOut #B2BJewelleryShow

Delhi Jewellery & Gem Fair is back with its 14th edition of North India’s iconic B2B jewellery expo! 💎

📅 26–28 September 2026
📍 Bharat Mandapam, New Delhi
Connect, discover and explore new opportunities across the jewellery industry.

3

Load More

HZ is the Official Supporter of :

Member Of

Founder Member Of